The installed Combined Cycle CHP Stations SYSTEM HUTTER have reached 790`000 operation hours and 92 operation years.
The longest Combined Cycle CHP Station SYSTEM HUTTER is in operation since 1990 and has accumulated about 190'000 operation hours.
The fleet time-reliability over the entire period has achieved values > 99 %.
Commissioning & Hand-over
2008
Annual Operation Hours
8600 h
Gas Turbine Model
Solar Taurus T65
Nominal Electrical Power Output Gas Turbo Set ISO
2 x 6.3 MW
Steam Turbine Type
Back-pressure
Nominal Electrical Power Ooutput Steam Turbo Set
13 MW
Nominal Total Electrical Capacity
25.6 MW
Nominal Live Steam Massflow
90 t/h
Nominal Live Steam Condition
65 - 90 bar
460 - 480 °C
Process Steam Pressure
6.0 bar
Fuel
Natural Gas
Installed Firing Rate Steam Generator at Combined Cycle
2 x 28 MW
Fuel Utilisation Factor
92 %
Time-Reliability
> 99 %
Emissions referred to 3 Vol-% O2 dry
NOx
30 ppm
CO
< 5 ppm
CO2-Emissions ref. to useful Electricity & Heating Energy
231.7 kg/MWh
Commissioning & Hand-over
2007
Annual Operation Hours
8600 h
Gas Turbine Model
Rolls Royce KB5
Nominal Electrical Power Output Gas Turbo Set ISO
3.5 MW
Steam Turbine Type
Extraction-Back-pressure
Nominal Electrical Power Output Steam Turbo Set
3.7 MW
Nominal Total Electrical Capacity
7.2 MW
Nominal Live Steam Massflow
26 t/h
Nominal Lve Steam Condition
45 bar
450 °C
Process Steam Pressure
9.0 & 3.6 bar
Fuel
Natural Gas
Installed Firing Rate Steam Generator at Combined Cycle
1 x 15 MW
Fuel Utilisation Factor
90.2 %
Time-Reliability
> 99 %
Emissions referred to 3 Vol-% O2 dry
NOx
45 ppm
CO
< 40 ppm
CO2-Emissions ref. to useful Electricity & Heating Energy
237.9 kg/MWh
Commissioning & Hand-over
2003
Annual Operation Hours
8600 h
Gas Turbine Model
Siemens SGT300
Nominal Electrical Power Output Gas Turbo Set ISO
7.6 MW
Steam Turbine Type
Back-pressure
Nominal Electrical Power Output Steam Turbo Set
8.5 MW
Nominal Total Electrical Capacity
16.1 MW
Nominal Live Steam Massflow
65 t/h
Nominal Live Steam Condition
70 bar
480 °C
Process Steam Pressure
6.0 bar
Fuel
Natural Gas
Installed Firing Rate Steam Generator at Combined Cycle
2 x 28 MW
Fuel Utilisation Factor
92.5 %
Time-Reliability
> 99 %
Emissions referred to 3 Vol-% O2 dry
NOx
35 ppm
CO
< 5 ppm
CO2-Emissions ref. to useful Electricity & Heating Energy
Commissioning & Hand-over
1996
Annual Operation Hours
8600 h
Gas Turbine Model
Rolls Royce KB7
Nominal Electrical Power Output Gas Turbo Set ISO
5.1 MW
Steam Turbine Type
Back-pressure
Nominal Electrical Power Output Steam Turbo Set
4.5 MW
Nominal Total Electrical Capacity
9.6 MW
Nominal Live Steam Massflow
45 t/h
Nominal Live Steam Condition
64 bar
450 °C
Process Steam Pressure
4.3 bar
Fuel
Natural Gas
Installed Firing Rate Steam Generator at Combined Cycle
2 x 16 MW
Fuel Utilisation Factor
92 %
Time-Reliability
> 99 %
Emissions referred to 3 Vol-% O2 dry
NOx
50 ppm
CO
< 5 ppm
CO2-Emissions ref. to useful Electricity & Heating Energy
231.7 kg/MWh
Commissioning & Hand-over
1994
Annual Operation Hours
8600 h
Gas Turbine Model
Solar Taurus T60
Nominal Electrical Power Output Gas Turbo Set ISO
4.6 MW
Steam Turbine Type
Extraction-condensing
Nominal Electrical Power Output Steam Turbo Set
10.0 MW
Nominal Total Electrical Capacity
14.6 MW
Nominal Live Steam Massflow
50 t/h
Nominal Live Steam Condition
64 bar
480 °C
Process Steam Pressure
3.8 bar
Fuel
Natural Gas & Fuel Oil No. 2
Installed Firing Rate Steam Generator at Combined Cycle
2 x 17 MW
Fuel Utilisation Factor
92.5 %
Time-Reliability
> 99 %
Emissions referred to 3 Vol-% O2 dry
NOx
60 ppm
CO
< 5 ppm
CO2-Emissions ref. to useful Electricity & Heating Energy
229.2 kg/MWh
Commissioning & Hand-over
1992
Annual Operation Hours
8600 h
Gas Turbine Model
Solar Taurus T60
Nominal Electrical Power Output Gas Turbo Set ISO
4.6 MW
Steam Turbine Type
Extraction-Condensing
Nominal Electrical Power Output Steam Turbo Set
10.5 MW
Nominal Total Electrical Capacity
15.1 MW
Nominal Live Steam Massflow
65 t/h
Nominal Live Steam Condition
110 bar
520 °C
Process Steam Pressure
9.0 & 3.6 bar
Fuel
Natural Gas
Installed Firing Rate Steam Generator at Combined Cycle
3 x 17 MW
Fuel Utilisation Factor
93 %
Time-Reliability
> 99 %
Emissions referred to 3 Vol-% O2 dry
NOx
70 ppm
CO
< 5 ppm
CO2-Emissions ref. to useful Electricity & Heating Energy
230.4 kg/MWh
Commissioning & Hand-over
1990
Annual Operation Hours
8600 h
Gas Turbine Model
Solar Centaur H
Nominal Electrical Power Output Gas Turbo Set ISO
4.2 MW
Steam Turbine Type
Back-pressure
Nominal Electrical Power Output Steam Turbo Set
5.6 MW
Nominal Total Electrical Capacity
9.8 MW
Nominal Live Steam Massflow
45 t/h
Nominal Live Steam Condition
64 bar
450 °C
Process Steam Pressure
3.6 bar
Fuel
Natural Gas & Bio Gas
Installed Firing Rate Steam Generator at Combined Cycle
2 x 15 MW
Fuel Utilisation Factor
93 %
Time-Reliability
> 99 %
Emissions referred to 3 Vol-% O2 dry
NOx
75 ppm
CO
< 5 ppm
CO2-Emissions ref. to useful Electriticy & Heating Energy
229.2 kg/MWh